surfaces/.planning/phases/01-matrix-qa-polish/01-05-SUMMARY.md
Mikhail Putilovskij 80800be60c docs(01-05): complete matrix confirmation scope plan
- add 01-05 summary with self-check results
- update planning state and roadmap progress for phase 01
2026-04-03 12:29:44 +03:00

4.4 KiB

phase plan subsystem tags requires provides affects tech-stack key-files key-decisions patterns-established requirements-completed duration completed
01-matrix-qa-polish 05 matrix
matrix
confirmations
regression-testing
adapter
phase provides
01-matrix-qa-polish Text confirmation flow and Matrix regression baseline from plans 01-03 and 01-04
Stable Matrix pending-confirm storage scoped by user id and room id
Matrix command callbacks that retain originating room context
Adapter-level confirm and cancel regressions covering send_outgoing round trips
matrix-adapter
matrix-tests
phase-01-closeout
added patterns
Matrix callback payloads carry room context
pending confirmations are keyed by user id plus room id
created modified
.planning/phases/01-matrix-qa-polish/01-05-SUMMARY.md
adapter/matrix/bot.py
adapter/matrix/converter.py
adapter/matrix/handlers/confirm.py
adapter/matrix/store.py
tests/adapter/matrix/test_converter.py
tests/adapter/matrix/test_confirm.py
tests/adapter/matrix/test_send_outgoing.py
Matrix command callbacks now include room_id in payload for !yes and !no so confirm handlers can resolve runtime state without changing core protocol types.
Pending confirmations are stored under the D-08 composite key of matrix user id plus room id, with a narrow legacy fallback only for callers that omit room context.
Matrix adapter send paths must derive transport-specific identity from room metadata before writing adapter-local state.
Adapter regressions should use mismatched Matrix room ids and logical chat ids to catch scope drift.
2 min 2026-04-03

Phase 01 Plan 05: Matrix Confirmation Scope Summary

Matrix confirmations now survive the real send_outgoing -> !yes/!no adapter round trip by keeping pending state scoped to the Matrix user and Matrix room.

Performance

  • Duration: 2 min
  • Started: 2026-04-03T09:26:32Z
  • Completed: 2026-04-03T09:27:55Z
  • Tasks: 2
  • Files modified: 7

Accomplishments

  • Aligned the Matrix adapter runtime so command callbacks keep room context and pending confirmation state uses the D-08 (user_id, room_id) scope.
  • Added a compatibility fallback in confirm handlers for legacy callers that do not send payload["room_id"].
  • Added adapter-level regressions for OutgoingUI -> !yes and OutgoingUI -> !no using distinct Matrix room ids and logical chat ids.

Task Commits

Each task was committed atomically:

  1. Task 1: Preserve Matrix user-and-room identity through the !yes / !no callback path - 35695e0 (fix)
  2. Task 2: Add end-to-end adapter regression tests for send_outgoing -> !yes / !no - 716dec5 (test)

Files Created/Modified

  • adapter/matrix/bot.py - derives the Matrix user id from room metadata before persisting pending confirmations.
  • adapter/matrix/converter.py - carries Matrix room_id in IncomingCallback.payload for !yes and !no.
  • adapter/matrix/handlers/confirm.py - resolves pending confirmations by (event.user_id, payload["room_id"]) with legacy fallback behavior.
  • adapter/matrix/store.py - supports composite pending-confirm keys while remaining compatible with older single-key callers.
  • tests/adapter/matrix/test_converter.py - asserts Matrix callbacks preserve logical chat_id and include payload["room_id"].
  • tests/adapter/matrix/test_confirm.py - validates composite-key confirm/cancel behavior and the legacy fallback path.
  • tests/adapter/matrix/test_send_outgoing.py - exercises send_outgoing to confirm/cancel round trips under user-and-room scope.

Decisions Made

  • Kept the contract change inside the Matrix adapter by extending callback payloads instead of changing core.protocol.IncomingCallback.
  • Preserved the old chat-id-only lookup only as a fallback path for older tests or non-room-aware callers.

Deviations from Plan

None - plan executed exactly as written.

Issues Encountered

None.

User Setup Required

None - no external service configuration required.

Next Phase Readiness

  • The Phase 01 confirmation blocker from 01-VERIFICATION.md is closed for the Matrix adapter runtime path.
  • Phase 01 still needs the remaining plan work outside 01-05, but this gap no longer blocks end-to-end !yes / !no behavior.

Self-Check: PASSED

  • Found .planning/phases/01-matrix-qa-polish/01-05-SUMMARY.md
  • Found commit 35695e0